Wire Road resurfacing work expected Feb. 10-11
February 07 2025
AUBURN, Ala.- Resurfacing work is expected on Wire Road between the entrance to the Wire Road Soccer Complex and Harvest Gate Lane on Monday and Tuesday, Feb. 10-11. Work is expected to take place between 8 a.m. and 5 p.m.
Intermittent lane closures are expected during the work. Traffic control measures will be in place to maintain two-way traffic.
Motorists are advised to use caution in the area.